| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | JGPV |
| Payment Terms : | L/C,T/T,Western Union |
| Supply Ability : | 500 Set per month |
| Delivery Time : | 14 days |
Highlight: Digital locking hydraulic flow control cut-off valve, low-temperature threaded thickened brass static valve
Product introduction:
The new digital lock balance valve produced by our company is a new type of energy-saving valve with special functions. As the valve is provided with digital display and digital locking device, can be directly adjusted to any position, and pressure measurement valve for flow measurement. This valve is mainly used in industrial and civil building heating pipe network system, has the good flow characteristic, can adjust the pressure drop and flow rate accurately, can reasonable distribution of flow, implementation flow quantitatively, can effectively solve the heating (air conditioning) to room temperature uneven and the problems existing in the system, as long as in the selection and user entry fitted with appropriate specifications of digital locked balance valve, And a special intelligent instrument for one-time debugging after locking, the total water control system in a reasonable range, so as to overcome the "large flow, small temperature difference" unreasonable phenomenon. Therefore, this product is an ideal product in heating system. The application of this valve can achieve the dual effect of liquid balance and energy reduction in pipe network.
Product technical parameters:
Model | SP45F-16Q |
Experimental pressure | 2.4mpa (24kgf/cm2) |
Work pressure | ≤1.6mpa (16kgf/cm2) |
Operating temperature | -10℃≈100℃ |
Use of medium | Water |
Characteristic curve | Equal percentage |
Scope of installation and use | The main trunk, branch trunk, indoor water supply main, branch riser, and multiple boilers of the pipeline network system |
Product features:
1. Before and after the static balance valve, sufficient length of
branch pipe sections must be installed to ensure the rated output
of the flow rate.
2. The installation position of the static balance valve should be
checked according to the drawing, and it is recommended to install
it on the HVAC system return pipeline. At the same time, the
direction of water flow in the pipeline should be checked, and the
installation should strictly follow the direction of the water flow
arrow on the valve body.
3. Before installing the static balance valve, the pipeline debris
must be cleaned thoroughly. It is strictly prohibited to leave
welding slag, branches, stones, and other debris in the pipeline to
avoid damaging the valve.
4. During the welding of pipeline flanges, excessive deformation
and welding angles should not affect the flatness of the sealing
surface.
5. After installation, the static balance valve should be fully
opened to allow for repeated flushing of the pipeline until it is
clean. It is strictly prohibited to repeatedly close the valve
during pipeline flushing to avoid damage.
Our Advantages:






|